Safety Controls & Devices

Book Building issueSMEBSE₹48 Cr issue
+3.75%
Listing gain over issue price
Price band
₹75 – ₹80
Issue size
₹48 Cr
Open
06 Apr 2026
Close
08 Apr 2026
Listing
13 Apr 2026

Listing performance

Issue price
₹80
Listed at
₹83
Listing-day close
—
Latest price
—
Listing gain
+3.75%

Scheduled dates

Tentative timetable — a past date is not confirmation the step completed

  1. Open
    06 Apr 2026
  2. Close
    08 Apr 2026
  3. Listing
    13 Apr 2026

Issue details

IPO date
06 Apr 2026 – 08 Apr 2026
Listing date
13 Apr 2026
Face value
₹10 per share
Price band
₹75 – ₹80
Issue price
₹80 per share
Issue type
Book Building issue
Listing at
BSE
Total issue size
₹48 Cr
ISIN
INE0UMH01018

Valuation and performance

Valuation at offer price

₹80 per share

MetricPre-issuePost-issue

About Safety Controls & Devices

Safety Controls & Devices Limited (SCDL), formerly Safety Controls & Devices Private Limited, was incorporated on June 01, 2015 in Lucknow, Uttar Pradesh and was later converted into a public limited company, with a fresh Certificate of Incorporation dated October 10, 2023 (CIN: U31908UP2015PLC071082). The company is primarily engaged in the EPC (Engineering, Procurement and Construction) business — installation of substations, construction of solar plants, installation of firefighting equipment, and construction of hospitals for the Ministry of Ayush — with experience in turnkey projects across transmission and distribution, solar energy, EV charging infrastructure, fire protection systems and hospital construction. Its customers are predominantly central and state government utilities; each project is awarded through competitive bidding where contracts are secured by emerging as the lowest (L1) bidder, and revenue is recognised on the percentage-of-completion method with milestone-based billing and retention money held until warranty periods lapse. Business verticals comprise Substations, Power Projects, Ayush Projects and Fire Protection; revenue from operations was ₹10,256.03 lakhs in FY 2024-25 with PAT of ₹899.04 lakhs, and the company disclosed an order book of ₹13,918.22 lakhs as of the Prospectus date (including a ₹8,353.00 lakh 220kV substation package for TUSCO Ltd. and a ₹5,565.22 lakh traction substation order from Rail Vikas Nigam Limited).

Company Analysis

from DRHP

Safety Controls & Devices Limited is a Lucknow-based engineering enterprise executing turnkey EPC (Engineering, Procurement and Construction) projects spanning power transmission substations, solar plants, firefighting systems, EV charging infrastructure and hospital construction for the Ministry of Ayush.

Safety Controls & Devices Limited (SCDL), formerly Safety Controls & Devices Private Limited, was incorporated on June 01, 2015 in Lucknow, Uttar Pradesh and was later converted into a public limited company, with a fresh Certificate of Incorporation dated October 10, 2023 (CIN: U31908UP2015PLC071082). The company is primarily engaged in the EPC (Engineering, Procurement and Construction) business — installation of substations, construction of solar plants, installation of firefighting equipment, and construction of hospitals for the Ministry of Ayush — with experience in turnkey projects across transmission and distribution, solar energy, EV charging infrastructure, fire protection systems and hospital construction. Its customers are predominantly central and state government utilities; each project is awarded through competitive bidding where contracts are secured by emerging as the lowest (L1) bidder, and revenue is recognised on the percentage-of-completion method with milestone-based billing and retention money held until warranty periods lapse. Business verticals comprise Substations, Power Projects, Ayush Projects and Fire Protection; revenue from operations was ₹10,256.03 lakhs in FY 2024-25 with PAT of ₹899.04 lakhs, and the company disclosed an order book of ₹13,918.22 lakhs as of the Prospectus date (including a ₹8,353.00 lakh 220kV substation package for TUSCO Ltd. and a ₹5,565.22 lakh traction substation order from Rail Vikas Nigam Limited).

EPC (Engineering, Procurement and Construction)power transmission and distribution (substation installation)renewable energy / solar powerfire protection systemshospital construction (healthcare infrastructure)EV charging infrastructure

Objects of the Issue

  • Repayment/prepayment, in part or full of certain of our borrowings
    ₹600.00 Lakhs p.102
  • Funding the Working Capital Requirements of our Company
    ₹3,150.00 Lakhs p.106
  • General Corporate Purpose
    ₹564.00 Lakhs p.111

Issue Structure

Total Issue
60,00,000 equity shares of face value ₹10 each aggregating ₹4,800 Lakhs
Fresh Issue
60,00,000 equity shares of face value ₹10 each at ₹80 per share (including securities premium of ₹70 per share), aggregating ₹4,800 Lakhs
Offer for Sale
NIL
Price Band
Minimum ₹75 per Equity Share (Floor Price) to maximum ₹80 per Equity Share (Cap Price)
Lot Size
1,600 Equity Shares and in multiples of 1,600 Equity Shares thereafter
Face Value
₹10 each

Business Model

The company earns revenue by executing turnkey EPC (Engineering, Procurement and Construction) contracts — design, engineering, supply, installation, erection, testing and commissioning — for substations, solar/power projects, firefighting systems and hospital construction, secured mainly through competitive bidding (lowest/L1 bidder) largely from central and state government entities; revenue is recognised under the percentage-of-completion method, billed on milestones/work-progress, with retention money released after warranty periods.

Business Segments

Turnkey design, supply, erection, testing and commissioning of transmission substations (e.g., 220 kV/400 kV substation packages) for government power utilities on EPC basis
Power sector projects including construction of solar plants
Construction projects of hospitals for the Ministry of Ayush
Installation of firefighting equipment and fire protection systems for government utilities and private clients (hospitals, commercial complexes, industrial establishments)
Not further described in the Prospectus beyond the 'Others' label

SWOT Analysis

Strengths
  • • Experienced promoter and management team(p.112)
  • • Scalable business model(p.112)
  • • Wide and diverse range of product/service offerings(p.112)
  • • In-house manufacturing facility with quality control and R&D(p.112)
  • • Established relationships with public sector entities; approved-vendor status with repeat business(p.26)
  • • Turnkey execution experience across multiple verticals (T&D, solar, EV charging, fire protection, hospitals)(p.18)
  • • Healthy order book providing revenue visibility(p.103)
Weaknesses
  • • Heavy customer concentration — loss of major clients would materially hurt operations and profitability(p.27)
  • • Persistent negative cash flows from operating activities(p.28)
  • • Total indebtedness of ₹3,917.87 lakhs (Jan 31, 2026) with debt-servicing and covenant risk(p.36)
  • • Geographic concentration — 100% of recent revenue from a single state (Uttar Pradesh)(p.30)
  • • Large and growing working capital requirement(p.29)
  • • Discrepancies and delayed/non-compliant statutory filings (ROC, GST)(p.31)
  • • Qualified audit opinions for FY2023-24 and FY2024-25 (gross GST recognition; write-off of advances)(p.48)
  • • Earlier DRHP filed with NSE EMERGE was returned for failing FCFE eligibility norms(p.28)
Opportunities
  • • India's net-zero 2070 pledge and 50%-renewables-by-2030 target support solar/power EPC demand(p.18)
  • • Fast-growing renewables base (125.15 GW, 15.4% CAGR since FY16) attractive to investors(p.18)
  • • Growing demand for power infrastructure to be capitalized upon(p.26)
  • • Strategy to diversify beyond Bihar/Uttar Pradesh into other segments(p.104)
  • • Strategy to enhance project execution capabilities and enter tunnel construction(p.29)
  • • Leverage supplier relationships and technical expertise to foray into newer technologies and geographies(p.104)
  • • IPO-funded incremental working capital expected to lift profitability per business plan(p.102)
Threats
  • • Intense EPC competition and aggressive bidding compressing margins(p.27)
  • • Reliance on government contracts exposes company to policy/regulatory and budgetary shifts(p.26)
  • • Disruption/shortage of raw materials and equipment (cement, steel, solar panels) raising costs and delaying projects(p.33)
  • • Inherent risks of power sector projects (policy changes, clearance delays, third-party failures)(p.38)
  • • Inflation may not be fully passed on to clients, reducing margins(p.53)
  • • Changes in laws, policies or regulations could materially adversely affect the business(p.53)
  • • Generally fixed fee structures may not offset post-commissioning increases in operation and maintenance costs(p.39)

Promoters

NameRolePre-IssuePost-Issue
Rajnish ChopraPromoter66.17%46.14%
Anjali ChopraPromoter0.01%0.01%
Abhishek ChopraPromoter0.35%0.24%

Leadership

Rajnish Chopra · Chairman and Managing Director
Abhishek Chopra · Whole-Time Director
Anjali Chopra · Non-Executive Director
Kamna Sharma · Independent Director
Tanuj Kumar Saxena · Independent Director
Ashutosh Mishra · Chief Financial Officer
Shiva Nigam · Company Secretary and Compliance Officer

Auto-extracted from the company's DRHP using AI, with each fact linked to its source passage (hover any row to see the quote & page). Provided for research only, not investment advice — verify against the official DRHP before relying on it.

Disclaimer. Figures are compiled from the issuer's offer document and exchange-published bidding data. Subscription changes until the issue closes, and the final basis of allotment is published by the registrar. Grey Market Premium is unofficial, indicative data from unregulated grey-market dealers — it is not published by NSE, BSE, SEBI or the issuer, and is not a forecast of the listing price. Nothing here is investment advice or a recommendation; read the offer document and consult a SEBI-registered adviser before applying.